tillergirl
Well-Known Member
I know this is a bit previous but I have a day in Turkey on Monday so this is best done now:
Permanent
Just 2
1. About a dozen or so depth reductions at the Long Sand Head, South Shipwash and edge of the Black Deep. All really for the big stuff rather than us apart from the South Shipwash if anyone goes over that!
2. AIS now fitted to RCE (approaches to Dunkirk) oppiste Dyck which already has AIS.
Temporary
1. The PLA have updated their policies on managing the Safety of Navigation and on Enforcement and Prosecution. There is a link, should anyone care to read them.
2. Work on a sluice on St Mary's Island, Upnor Reach, Medway.
That's it.
Permanent
Just 2
1. About a dozen or so depth reductions at the Long Sand Head, South Shipwash and edge of the Black Deep. All really for the big stuff rather than us apart from the South Shipwash if anyone goes over that!
2. AIS now fitted to RCE (approaches to Dunkirk) oppiste Dyck which already has AIS.
Temporary
1. The PLA have updated their policies on managing the Safety of Navigation and on Enforcement and Prosecution. There is a link, should anyone care to read them.
2. Work on a sluice on St Mary's Island, Upnor Reach, Medway.
That's it.