tillergirl
Well-Known Member
Permanent
Just one this week; a further reduction in depth out of the main channel of the River Thames to 5.7m off Tilburyness. This is a change to an earlier reduction in depth at the same place notified in week 21 but still should not trouble leisure craft.
Temporary
1. London Array - continuing the in-field cable burying work;
2. Work notified at Gravesend Sailing Club for a new jetty and removal of Henley's Jetty at Gravesend requiring a slow passing during the work;
3. Advance Notice of changes of the Yantlet Channel marking that will take place during August. The change will involve removal of the centre line of buoys and insertion of paired 'gates' of buoys.
That's it.
Just one this week; a further reduction in depth out of the main channel of the River Thames to 5.7m off Tilburyness. This is a change to an earlier reduction in depth at the same place notified in week 21 but still should not trouble leisure craft.
Temporary
1. London Array - continuing the in-field cable burying work;
2. Work notified at Gravesend Sailing Club for a new jetty and removal of Henley's Jetty at Gravesend requiring a slow passing during the work;
3. Advance Notice of changes of the Yantlet Channel marking that will take place during August. The change will involve removal of the centre line of buoys and insertion of paired 'gates' of buoys.
That's it.