tillergirl
Well-known member
Permanent
1. Couple of reduced depths and five obstructions found to the south of the Cutler SHB.
2. Change of name on the North Cardinal Buoy to the NE of Niewpoort.
3. Removal of light at the entrance to the inner harbour in Calais.
Temporary
1. River Thames - Works at Imperial Wharf, Gravesend Reach
2. River Thames - Works on the Tilbury Landing Stage, north side of Gravesend Reach that will continue until November.
3. River Crouch - Nos 1 and 3 Fairways Buoys - light characteristics altered to Flashing Green 6 seconds.
4. River Roach - amendment to the position of Barton Hall No 3 and Mucking No 4 buoys.
C'est toutes mes amis.
1. Couple of reduced depths and five obstructions found to the south of the Cutler SHB.
2. Change of name on the North Cardinal Buoy to the NE of Niewpoort.
3. Removal of light at the entrance to the inner harbour in Calais.
Temporary
1. River Thames - Works at Imperial Wharf, Gravesend Reach
2. River Thames - Works on the Tilbury Landing Stage, north side of Gravesend Reach that will continue until November.
3. River Crouch - Nos 1 and 3 Fairways Buoys - light characteristics altered to Flashing Green 6 seconds.
4. River Roach - amendment to the position of Barton Hall No 3 and Mucking No 4 buoys.
C'est toutes mes amis.