tillergirl
Well-Known Member
Seems a lot this week - well it took a little longer than usual!
Permanent
1. UKHO confirmation of the change of depth (to 3.2m) on the ridge near Ridge on the recommended leisure craft route into Harwich.
2. AIS on two buoys near the Sandettie.
3. Couple of UKHO blocks showing changes to depths in the Roompot.
4. Reduced depths in the Slijkgat on the way to Haringvlietsluis.
5. Increased area to the Schouwenbank anchorage (sort of on the way up the coast to the Hook of Holland). Removal of a cardinal buoy and the placement of a new Yellow anchorage marker.
Temporary
1. The Sheerness Outfall Cardinal Buoy is lit again.
2. An unreliable light within Lowestoft Harbour.
3. Notice of survey work in the area of the East Anglia Wind Farm zone. It's a big area and will take 20 days.
4. As raised by Roger already, an exclusion zone at the London gateway for the new cranes.
5. An update on the dredging work from Sea Reach out to the Sunk in connection with the Gateway project.
6. Continuation of cable burying on the London Array - all in-field work.
That's it.
Permanent
1. UKHO confirmation of the change of depth (to 3.2m) on the ridge near Ridge on the recommended leisure craft route into Harwich.
2. AIS on two buoys near the Sandettie.
3. Couple of UKHO blocks showing changes to depths in the Roompot.
4. Reduced depths in the Slijkgat on the way to Haringvlietsluis.
5. Increased area to the Schouwenbank anchorage (sort of on the way up the coast to the Hook of Holland). Removal of a cardinal buoy and the placement of a new Yellow anchorage marker.
Temporary
1. The Sheerness Outfall Cardinal Buoy is lit again.
2. An unreliable light within Lowestoft Harbour.
3. Notice of survey work in the area of the East Anglia Wind Farm zone. It's a big area and will take 20 days.
4. As raised by Roger already, an exclusion zone at the London gateway for the new cranes.
5. An update on the dredging work from Sea Reach out to the Sunk in connection with the Gateway project.
6. Continuation of cable burying on the London Array - all in-field work.
That's it.