Tiller Girl
Well-Known Member
Week 2 has also listed Notices this week but hasn't finished off the weekly list so presumably might add some after the Bank Holiday. So this is up to date at this moment but might add some more tomorrow and non holiday days this week.
Permanent
1. Week 2 has three reduced depths in the approaches to Lowsestoft. One of the three is worth noting in particular; in Lowestoft South Road a spot is shown over 6m is now reduced 0.9m! Pretty slap dans le middle!
2. Week 1 has one deleting nine ship mooring buoys south side of the Thames just east of Barking Creek.
Temporary
1. The President 1918 (the ship) is being moved by towage (and reduction in height by a crane/barge) down to the Medway on or around 25th January. It will move slowly from the Embankment down to Medway.
2. Mutford Lock closed from 4th to 10th January;
3. Woolverstone Marina (MDL), has construction and dredging works due to commence at Woolverstone Marina on or around the 11th January 2016. These works are scheduled to last for approximately 8 weeks. Involved with a Spud legged backhoe dredger, Multicat, 2 Split hopper barges and a Workboat. The Split hopper Barges will be depositing material in the disposition area in Buttermans Bay & Long Reach.
No 2 is the Broads. I have always been reading the Broads NtM but I have never bothered to add them. Should I?
Permanent
1. Week 2 has three reduced depths in the approaches to Lowsestoft. One of the three is worth noting in particular; in Lowestoft South Road a spot is shown over 6m is now reduced 0.9m! Pretty slap dans le middle!
2. Week 1 has one deleting nine ship mooring buoys south side of the Thames just east of Barking Creek.
Temporary
1. The President 1918 (the ship) is being moved by towage (and reduction in height by a crane/barge) down to the Medway on or around 25th January. It will move slowly from the Embankment down to Medway.
2. Mutford Lock closed from 4th to 10th January;
3. Woolverstone Marina (MDL), has construction and dredging works due to commence at Woolverstone Marina on or around the 11th January 2016. These works are scheduled to last for approximately 8 weeks. Involved with a Spud legged backhoe dredger, Multicat, 2 Split hopper barges and a Workboat. The Split hopper Barges will be depositing material in the disposition area in Buttermans Bay & Long Reach.
No 2 is the Broads. I have always been reading the Broads NtM but I have never bothered to add them. Should I?