Ugh - Learnt a lesson there, not to go away on holiday: 6 Permanent UKHO notices week 8 and 4 in week 9, Temporary Notices 10 notices! And good passage planning for holiday; 12 hr flight and 12 hrs later a tropical storm arrives. All anchorages emptied, airport closed and the water reservoirs (which were low) gets full!
Permanent
Week 8
1. ENGLAND - East Coast - River Crouch and River Roach - Buoyage. - Crouch Harbourmaster had advised a temp notice couple of weeks back correcting the UKHO light characteristics of the Crouch Fairway No 1 (which was correct on Imray charts) and changes of the lights characteristics of the Roach No 3.
2. ENGLAND - East Coast - Outer Gabbard E - Buoyage. - the two East Gabbard Yellow Special Buoys now deleted and replaced by 4 similar buoys in sort of the smae place;
3. ENGLAND - Thames Estuary - Knob Gat - Depths. - some pretty serious reduction of the Gat's depth - see the image at the usual page: http://www.crossingthethamesestuary.com/page9.html
4. ENGLAND - East Coast - Yantlet Channel - Depths. - a minor reduction of dept in the Yantlet Channel - won't hinder leisure craft;
5. ENGLAND - South East Coast - Sandettié Bank NW - Depths. - pretty similar; in theTSS and will not hinder leisure creaft;
6. ENGLAND - Thames Estuary - North Hinder South TSS - Wreck. Buoyage. Radar beacon. Restricted area. - Formal UKHO notification of the wreck in the TSS that I had previously advised vide the Trinity House NtM;
Week 9
1. BELGIUM - Akkaertbank W - Wreck. - new 'old' wreck found in the outer shipping approach to Oostende - at 25m;
2. NETHERLANDS - Slijkgat - Depths. - new reduced depths at the Slijkgat on the approaches to Stellendam;
3. FRANCE - North Coast - Dunkerque Port Ouest - Intake. Piles. Light. - All in the Commercial West Harbour where we can't go;
4. ENGLAND - East Coast - Faversham Creek - Obstruction. - That is the UKHO notification of the dangerous obstruction in Faversham Creek - Taht had been notified by Peel Ports back in week 3. See the Temporary Notice in week 3 to see the image but see the chart position in this week Permanent list;
Temporary
1. Trinity House have advised a small but important move to the east for the Inner Fisherman. Not a good idea to cut the corner; Image can be found in the Temporary List;
2. Port of London notification for the season's Woolwich Barriers closures;
3 and 4 - Peel Port advising of routine maintenance and inspections on the M2 bridge;
5. LAKE LOTHING – OULTON RAILWAY BRIDGE – NEW LIGHTS ESTABLISHED - Mariners and Port-Users are advised that new Navigation lights have been established to mark the Navigable channel transiting from Lake Lothing to Mutford Lock entrance under the Oulton Railway Bridge. Details can be found in the Temporary List.
6. Lowestoft - PONTOON INSTALLATION IN TRAWL DOCK AND ASSOCIATED VESSEL MOVEMENTS - starting from today for up to 3 weeks;
7. Lowestoft - LOWESTOFT OUTER HARBOUR, CRANE OVERHANG FROM SEMBMARINE SLP SOUTH LOAD OUT BERTH - A new crane which freewheels over the channel!
8. Lowestoft - LOWESTOFT BASCULE BRIDGE - TEMPORARY CLOSURE TO MARINE TRAFFIC - Monday 27th February;
9. Port of Wells dredging;
10. Kings Lynn Approach chartlet revised this month - download link provided in the Temporary List.
That is that.
Permanent
Week 8
1. ENGLAND - East Coast - River Crouch and River Roach - Buoyage. - Crouch Harbourmaster had advised a temp notice couple of weeks back correcting the UKHO light characteristics of the Crouch Fairway No 1 (which was correct on Imray charts) and changes of the lights characteristics of the Roach No 3.
2. ENGLAND - East Coast - Outer Gabbard E - Buoyage. - the two East Gabbard Yellow Special Buoys now deleted and replaced by 4 similar buoys in sort of the smae place;
3. ENGLAND - Thames Estuary - Knob Gat - Depths. - some pretty serious reduction of the Gat's depth - see the image at the usual page: http://www.crossingthethamesestuary.com/page9.html
4. ENGLAND - East Coast - Yantlet Channel - Depths. - a minor reduction of dept in the Yantlet Channel - won't hinder leisure craft;
5. ENGLAND - South East Coast - Sandettié Bank NW - Depths. - pretty similar; in theTSS and will not hinder leisure creaft;
6. ENGLAND - Thames Estuary - North Hinder South TSS - Wreck. Buoyage. Radar beacon. Restricted area. - Formal UKHO notification of the wreck in the TSS that I had previously advised vide the Trinity House NtM;
Week 9
1. BELGIUM - Akkaertbank W - Wreck. - new 'old' wreck found in the outer shipping approach to Oostende - at 25m;
2. NETHERLANDS - Slijkgat - Depths. - new reduced depths at the Slijkgat on the approaches to Stellendam;
3. FRANCE - North Coast - Dunkerque Port Ouest - Intake. Piles. Light. - All in the Commercial West Harbour where we can't go;
4. ENGLAND - East Coast - Faversham Creek - Obstruction. - That is the UKHO notification of the dangerous obstruction in Faversham Creek - Taht had been notified by Peel Ports back in week 3. See the Temporary Notice in week 3 to see the image but see the chart position in this week Permanent list;
Temporary
1. Trinity House have advised a small but important move to the east for the Inner Fisherman. Not a good idea to cut the corner; Image can be found in the Temporary List;
2. Port of London notification for the season's Woolwich Barriers closures;
3 and 4 - Peel Port advising of routine maintenance and inspections on the M2 bridge;
5. LAKE LOTHING – OULTON RAILWAY BRIDGE – NEW LIGHTS ESTABLISHED - Mariners and Port-Users are advised that new Navigation lights have been established to mark the Navigable channel transiting from Lake Lothing to Mutford Lock entrance under the Oulton Railway Bridge. Details can be found in the Temporary List.
6. Lowestoft - PONTOON INSTALLATION IN TRAWL DOCK AND ASSOCIATED VESSEL MOVEMENTS - starting from today for up to 3 weeks;
7. Lowestoft - LOWESTOFT OUTER HARBOUR, CRANE OVERHANG FROM SEMBMARINE SLP SOUTH LOAD OUT BERTH - A new crane which freewheels over the channel!
8. Lowestoft - LOWESTOFT BASCULE BRIDGE - TEMPORARY CLOSURE TO MARINE TRAFFIC - Monday 27th February;
9. Port of Wells dredging;
10. Kings Lynn Approach chartlet revised this month - download link provided in the Temporary List.
That is that.