No permanent UKHO notices this week in the monitored area.
Temporary
1. River Thames, Woolwich Barrier monthly tests between May and September;
2. River Medway - CRESCENT WHARF (QUARY YARD) RIVER WORKS - piling works have been undertaken at Crescent Wharf to improve berth facilities. These works extend marginally into the river on a drying bank; a small jetty now extends into the river and can be seen at all states of the tide. Six piles have also been positioned upstream of the jetty. The piles are visible at low water. Located in Limehouse Reach - see images at http://www.crossingthethamesestuary.com/page9.html in the Temporary List;
3. Oulton Broad - Navigation Restriction due to Power Boat Racing Oulton Broad 2016 dates April through to September, see the list in the same above location;
4. Port of Wells - more dredging
That's it.
Temporary
1. River Thames, Woolwich Barrier monthly tests between May and September;
2. River Medway - CRESCENT WHARF (QUARY YARD) RIVER WORKS - piling works have been undertaken at Crescent Wharf to improve berth facilities. These works extend marginally into the river on a drying bank; a small jetty now extends into the river and can be seen at all states of the tide. Six piles have also been positioned upstream of the jetty. The piles are visible at low water. Located in Limehouse Reach - see images at http://www.crossingthethamesestuary.com/page9.html in the Temporary List;
3. Oulton Broad - Navigation Restriction due to Power Boat Racing Oulton Broad 2016 dates April through to September, see the list in the same above location;
4. Port of Wells - more dredging