No doubt this has already been posted here, from 1st June the Nore Swatchway is closed for navigaition.
Latest update: Over the weekend near the cable laying operation at low water, the spoil removed from the trench is alongside the trench thats been excavated and sits about 2m ABOVE the low water mark. The area is closed for navigation, if you stray off course you'll soon be told by the dredging crew or find out as you hit the mud!
http://www.medwayports.com/assets/pdf/notices/2010/ntm_14_2010.pdf
Latest update: Over the weekend near the cable laying operation at low water, the spoil removed from the trench is alongside the trench thats been excavated and sits about 2m ABOVE the low water mark. The area is closed for navigation, if you stray off course you'll soon be told by the dredging crew or find out as you hit the mud!
http://www.medwayports.com/assets/pdf/notices/2010/ntm_14_2010.pdf