Coaster
Well-Known Member
As nobody else has yet commented, I thought the forum would like to see the proposal that's been made to amend the lock at Milford Docks. The Port Authority has issued a press release and emailed it to Milford Marina bertholders. It states:
New lock gates are to be designed and installed at Milford Marina over the next two years, transforming the way the Marina can be accessed and boosting marine tourism and business in Milford Haven.
Andrew Brown, Engineering Director at Milford Haven Port Authority (MHPA) said: "At the moment berth holders just can't access and exit as much as they'd like. Our plans will reduce the locking time and make Milford Marina one of the most accessible locked marinas anywhere in Britain. From an engineering point of view this is an exciting project since the introduction of a completely new set of lock gates is a rare occurrence in British docks."
A simple plan is included:
The full text of the press release is here should anyone wish to read it.
I wonder if the new lock arrangements will actually be built, and if so whether the December 2013 completion date will be met.
New lock gates are to be designed and installed at Milford Marina over the next two years, transforming the way the Marina can be accessed and boosting marine tourism and business in Milford Haven.
Andrew Brown, Engineering Director at Milford Haven Port Authority (MHPA) said: "At the moment berth holders just can't access and exit as much as they'd like. Our plans will reduce the locking time and make Milford Marina one of the most accessible locked marinas anywhere in Britain. From an engineering point of view this is an exciting project since the introduction of a completely new set of lock gates is a rare occurrence in British docks."
A simple plan is included:
The full text of the press release is here should anyone wish to read it.
I wonder if the new lock arrangements will actually be built, and if so whether the December 2013 completion date will be met.