hairbox
Member
Hi I am planning a passage from the river medway to flushing, it looks straight forward just the TSS crossing to worry about and allowing for enough water to get into the marina at flushing.
Has anyone got any other onfo I should know about before setting out
thanks
<hr width=100% size=1>
Has anyone got any other onfo I should know about before setting out
thanks
<hr width=100% size=1>