oldgit
Well-Known Member
We were pleased to entertain visitors for lunch today.
Their whaler was launched at Yalding, should have been Tonbridge (bridge problems), then rowed down the Medway with an overnight stop at Allington.
After lunch the boat continued downstream for recovery on the MYC slip at Upnor and return back to Henley.
The Long Row.
http://www.henleywhalers.org.uk/
Their whaler was launched at Yalding, should have been Tonbridge (bridge problems), then rowed down the Medway with an overnight stop at Allington.
After lunch the boat continued downstream for recovery on the MYC slip at Upnor and return back to Henley.
The Long Row.
http://www.henleywhalers.org.uk/
Last edited: