morgandlm
Well-Known Member
After following earlier threads on this topic, I have fitted a length of 8mm double braid from the boom end to a hook at the top of the kicker on my Sadler 26. I have also prepared a long line to reach from the cockpit to a block just aft of the bow and back to the kicker end of the boom line. I think that this set-up will work OK but am unsure how best to handle the lines during a gybe. I assume I will simply release the line at the cockpit end, complete the gybe and then sort out the preventer after the gybe (either removing it or setting it up for the new tack). My concern is that after the gybe, the preventer will run from the block at the bow, outside the shrouds on the old tack and then across the coach roof and on to the end of the boom. Potentially a mess?!
The above applies if having to gybe in a hurry - but is it better to remove the preventer before a gybe when this is practicable? Can those who use a preventer like this please advise how they do it, bearing in mind that some of the time I will be single-handed.
Thanks
Morgan
The above applies if having to gybe in a hurry - but is it better to remove the preventer before a gybe when this is practicable? Can those who use a preventer like this please advise how they do it, bearing in mind that some of the time I will be single-handed.
Thanks
Morgan