Esper Refit 25 - new teak toe rail and rubbing strake

demonboy

Well-Known Member
Joined
11 Oct 2004
Messages
2,237
Location
Indonesia
www.youtube.com
As usual the busiest man on the Esper refit project is Pong, the head carpenter. He's been assisted by his sons in finishing off the new teak toe rail and the teak rubbing strake down the side of the boat. Sombat, meanwhile, cracks on with the electrics.

Here's the new teak toe rail offered up to the edge of the deck and the slopes, lines, end pencilled in before routing.

DSC04904.jpg



And this is the final effect we're looking for. Liz has signed this off and the routing will be done once the rail is fixed in place.
DSC04996.jpg


The rail is secured with 3M adhesive and bolted down.
DSC05053.jpg


Here's a little peek at both the toe rail and the rubbing strake, which has also been fitted.
DSC05059.jpg



We're also fitting some new navigation equipment, including an 8" touch screen plotter at the binnacle. Here's the template for the box, which will be shaped and eventually sprayed in the same Awlcraft as the deck.
DSC04932.jpg



Video update inc teak toe rail fitting here: http://followtheboat.com/2014/08/10/esper-refit-week-25/
 
Excellent. The stainless rod let into the rubbing strakes is new to me, very neat.

Yes, it's a nice touch. It was always part of the rubbing strake's design, so we've simply replaced the outer strip of teak, polished the rods and used new bolts to secure it back in place.
 