co256
Well-Known Member
I have two 1.2 metre lengths of 20mm Barton T track to curve.
The max deflection is 60mm.
I've got them clamped in place along a length of heavy timber and screwed it down.
Anyone have any idea how long it will take to "set" ?
The max deflection is 60mm.
I've got them clamped in place along a length of heavy timber and screwed it down.
Anyone have any idea how long it will take to "set" ?