oldbilbo
...
I'm puzzled. More than usually... 
Y'see, I have some new batteries to install in my quite simple 27' sailyboat, and I can't quite make up my mind about an optimum arrangement. The previous setup was 2 x 110AH wet batteries, one each side in an under-berth box. One of those had died, while the other seems to have some life left, in that it seems to hold a charge for more than a day or two.
I've acquired 3 new AGM batteries, 2 x 66AH and 1 x 110AH.
There's a simple 1-BOTH-2-Off control, and I have several Key-type Connectors which I might fit, if so persuaded.
The 12hp engine drives a basic generator.
Loads are likely to be modest, as I'm replacing ALL incandescents with LED and I'll use self-contained battery-driven LED lighting for much of the night lighting need. There's no radar. I tend to switch off electronic nav gear when I'm not actuially using the info, including sounder when out of soundings, and GPS when I can see my posiiton on the landscape when I need to - apart from fog/rain/smirn/night.
I'll have two modest PV panels which I can use to help recover battery energy used, together with a small genset. So, how best might I arrange my battery layout re Services/Engine Start....... considering that I'm likely to need to change the containers/stowage arrangements.
Y'see, I have some new batteries to install in my quite simple 27' sailyboat, and I can't quite make up my mind about an optimum arrangement. The previous setup was 2 x 110AH wet batteries, one each side in an under-berth box. One of those had died, while the other seems to have some life left, in that it seems to hold a charge for more than a day or two.
I've acquired 3 new AGM batteries, 2 x 66AH and 1 x 110AH.
There's a simple 1-BOTH-2-Off control, and I have several Key-type Connectors which I might fit, if so persuaded.
The 12hp engine drives a basic generator.
Loads are likely to be modest, as I'm replacing ALL incandescents with LED and I'll use self-contained battery-driven LED lighting for much of the night lighting need. There's no radar. I tend to switch off electronic nav gear when I'm not actuially using the info, including sounder when out of soundings, and GPS when I can see my posiiton on the landscape when I need to - apart from fog/rain/smirn/night.
I'll have two modest PV panels which I can use to help recover battery energy used, together with a small genset. So, how best might I arrange my battery layout re Services/Engine Start....... considering that I'm likely to need to change the containers/stowage arrangements.
Last edited: